EmusBMS

15. Is it recommended to use a contactor with the EMUS G1 BMS system?

The main contractor should be installed behind all load devices and its coil terminals should be connected directly between the Control Unit’s power supply positive terminal and one of the general-purpose outputs mapped with “PF12 Battery Contactor Output”.